Download Building owner's and manager's guide: optimizing facility by Robert S. Curl PDF

By Robert S. Curl

Addresses the entire key parts contributing to potent administration of establishing operational functionality. comprises occupant convenience and compliant solution, unwell construction syndrome prevention and remediation, utilizing shrewdpermanent construction layout to facilitate optimal operational functionality, and twist of fate prevention and protection. DLC: construction administration.

Show description

Read or Download Building owner's and manager's guide: optimizing facility performance PDF

Best electrical & electronic engineering books

The UMTS network and radio access technology: air-interface techniques for future mobile systems

The UMTS community and Radio entry know-how covers all of the key elements of UMTS and its implementation from either the engineering layout and the operator and repair companies' viewpoint. It addresses the basic initiatives occupied with UMTS community deployment in new areas and inside of present 2G networks.

Intelligent Broadband Networks

Clever Broadband Networks Edited via lakovos Venieris nationwide Technical college of Athens, Greece and Heinrich Hussmann Dresden collage of expertise , Germany 'Intelligent community components' display screen the move of consumer provider requests, which allows clever Networks (IN) to control and regulate transmission, prone and connections, and repair allocation around the community immediately.

Extra resources for Building owner's and manager's guide: optimizing facility performance

Example text

The dry bulb is the actual temperature. The wet bulb is the temperature at 100% relative humidity. Using these two readings and a chart, you can determine the actual relative humidity and dew point. You have to swing the unit in the air until the reading stops changing. Digital equipment is also available which is direct reading but is slow and requires calibrating. 4. To measure air flow, the fan type thermometer is best, especially at minimum air motion, so you can watch the blades turn. This is better than using a handkerchief or facial tissue.

What happens when urethane plastics burn? Answer: Generates hydrochloric acid and phosgene. 2. Does algae grow in the drain pan of air conditioning units?

Gauges on Page 26 Figure 4-7. Pressure gauges. Page 27 Figure 4-8. Speed indicators and light meters. Page 28 Figure 4-9. Electric testers. vibrating or surging machinery should be removed and tested at least every six months. ) Speed Instruments are direct contact or stroboscopic light flashing (see Figure 4-8). Lighting Use light meter reading in fc (footcandles) (see Figure 4-8). Page 29 Electric Ammeters, voltmeters, wattmeters, and power factor meters are available (see Figure 4-9). Special Conditions Air flow volume from a ceiling outlet cannot be measured without a hood or collecting box since part of the air is being sucked in the center.

Download PDF sample

Rated 4.35 of 5 – based on 45 votes